SOME INFORMATION ABOUT PADMA BRIDGE

Padma Bridge: – It is good to know
1.  Q: What is the name of the Padma Bridge project?
Answer: Padma Multipurpose Bridge Project.
2.  Question: What is the length of Padma bridge?
Answer: 6.15 km.
3.  Question: What is the width of Padma bridge?
Answer: 72 feet four lane road.
4.  Q: Where will the railway line be laid on the Padma Bridge?
Answer: Downstairs.
5.  Question: How many kilometers is the viaduct of Padma bridge?
Answer: 3.17 kilometers.
.  Question: How many kilometers is the road connecting Padma bridge?
Answer: 14 kilometers at both ends.
.  Q: How many kilometers has been ruled by the Padma Bridge project?
Answer: 12 kilometers on both sides.
.  Q: What is the total cost of the Padma Bridge project?
Answer: 26 thousand 793 crore 39 lakh rupees on the main bridge.
9.  Question: What is the cost of river management in Padma bridge project?
Answer: 6 thousand 706 crore 71 lakh rupees.
10.  Q: How many manpower in the Padma Bridge project?
Answer: About 4 thousand.
11.  Question: How many viaduct pillars of Padma bridge?
Answer: 61.
12.  Question: What is the height of Padma bridge from the water level?
Answer: 60 feet.
13.  Q: What is the piling depth of Padma bridge?
Answer: 363 feet.
14.  Q: How many pilings for each pillar?
Answer: 6.
15.  Question: What is the total number of piling of Padma bridge?
Answer: 264.
16.  Question: When will the construction of Padma bridge be completed?
Answer: December 16, 2022.
16.  Q: What will be on the Padma Bridge?
Answer: Gas, electricity and optical fiber line transportation facilities.
16.  Q: What is the type of Padma bridge?
Answer: This two storey bridge will be constructed with concrete and steel.
19.  Question: What is the number of pillars of Padma bridge?
Answer: 42.
20.  Q: What is the name of the company contracted for the Padma Bridge project?
Answer: China Railway Group Limited.


One response to “SOME INFORMATION ABOUT PADMA BRIDGE”

Leave a comment

Design a site like this with WordPress.com
Get started